Company Profile
Expression of tradition, Frigotermica s.r.l. born in 1975.The company is part of the realization in the field of air conditioning systems and manufacture of special components needed to individual customers, being a hit.
N°16 Workshop/Manufacture
360 m2 – Offices
1.080 m2 – Workshop
5.000 m2 - Warehouse
Frigotermica has been responding to Clients’needs since 1975.
Frigotermica manufactures the products in either the normal or explosion-proof execution.
As Frigotermica is involved with the whole process of design andmanufacture, H.V.A.C. systems and equipment can be specially designed and constructed to meet the needs of each Client.
At present Frigotermica has the internal resources to supply a complete EPC H.V.A.C. system including:
engineering;
procurement;
assembly and construction;
testing;
installation or assistance to installation;
commissioning and start-up;
maintenance.
All the activities are carried out internally in compliance withUNI EN ISO 9001:2008 standard.
Due to a flexible internal structure and staff experience Frigotermica is able to provide a product tailored to your need.
Company Divisions
With the assistance of skilled technicians, young men introduced in the engineering dept., Frigotermica has been able to increase the customers and to improve the quality of the final product.
This new expansion has allowed the division of Frigotermica in four departments listed below, each with its own manager.General director
President
Amministration
Project manager Senior
Purchasing Office
Secretary
Project Engineering Senior
COMMERCIAL Department
It supervises the qualfication internal procedure with the customer;
It issues the economic and technical offers for submission to various customers;
It talks over the economically and technically deals with different customers;
It receives and assigns the various construction contracts to the most qualified technicians;
MACHINERY Department
Edit all customers required documents;
Search the materials according with customers specification;
ENGINEERING Department
Discuss technically the project with customer engineers;
Realize offers request offers to all sub-suppliers;
Plan with the Machinery dept. the realization of each units;
Receipt, Check, Tests with the customer and Pack the contract material;
Draw up the Final Documentation;
ELECTRICAL CONTROL PANELS Department
Edit all customers required documents;
Serch the materials according with customers specification;
Office Of Engineering And Design
Department of Mechanical and Electrical Production
Industrial building of 1000 square meters with about as many discovered
The department is divided mainly 3 areas:
1. Department cutting and folding: in this area using automated machine control number, are cut and bent components needed to implement the various units;
2. Assembly department: the individual components that had been cut and folded come assembled as assembly drawings, completed the installation installs all the necessary components, the cooling is carried out and the entire electrical wiring;
3. Department of Electrical: All electrical panels are assembled, including any programmed PLC.